Lib Dem councillors attend Greenbelt protest in Durham City

WP_20150926_12_31_44_Pro

 

Cllr David Freeman, Cllr Nigel Martin and I attended the County Plan protest in the Durham Market Place today. It was well attended with some good speeches.

I have arranged a meeting with the Head of Planning this coming week to get to the bottom of how the Council plans to proceed now that it has managed to get around the Inspector’s decision to reject the County Plan.

As I see it there are a number of ways the Council could deal with this:

1. Put out an alternative County Plan in a few months for “consultation” and then ignore every view which comes back – as it has done throughout the process.

2. Arrange proper consultation sessions before producing ANY proposals and then produce an alternative plan without taking account of residents proposals – less likely but wouldn’t surprise me.

3. Arrange proper consultation on the areas of the plan which the Inspector and residents disagreed with – before producing a proposal, including the changes residents want and publish the alternative plan – how it should be done but almost certainly will not happen!

Whatever happens you can be sure it will be Lib Dem councillors standing up for our World Heritage City against a Labour-run council which so far has completely and utterly ignored the views of the vast majority of residents from Durham City and the surrounding villages.

Fire station site development issues

A number of residents have contacted us recently about vibrations, dust and other issues from the work being done on the former fire station site in Framwellgate Moor. the new housing development will be started soon once the demolition and clearance has been completed.

We have been working with Environmental Health and Planning, and some dust reduction machinery was brought in. More recently there have been further complaints about vibrations from the work going on.

I have asked officers try and get the developer to install some vibration measuring devices. (more…)

Holmlands Crescent repairs carried out, more reported

holmlands crescent path repair

Picture of work done.

For some time I have been asking for this path to be fixed. Well perseverance pays off. This and other repairs I reported on Holmlands Crescent have been actioned. many more are still waiting to be done.

I have of course had to report more problems on this and other streets in the last few days including broken paving and kerbs, potholes, trip hazards and requests for resurfacing, including but not exclusive to Hudspeth Crescent, The Avenue, Durham Moor Crescent, Woodbine Road. More will no doubt follow in the coming days.

It’s just a shame the County Council isn’t more proactive. If it spent the money it had more efficiently and listened to Lib Dem councillors, a lot more work would get done, for a much lower price and repeat repairs wouldn’t be necessary. (more…)

Council refuses to advertise externally for new Chief Exec

Our esteemed Labour-run council has refused a Lib Dem request to advertise the position of Chief Exec outside of the Authority.

This was with the support of at least one of the independent group leaders and the Conservative group leader. Only the Lib Dems pushed for transparent process.

I fail to understand what the council has to lose by advertising to get the best person for job. None of the internal applicants would have anything to worry about if they are up to the position. There are senior officers who may be capable of being Chief Exec but it is unacceptable for local residents to not have a fully open selection.

The council has reduced the salary for the position from just over £200k down to £185k. However this is unlikely to save any money since the existing Chief Exec hasn’t been getting pension contributions from the Authority for a few years, and there is a good chance whoever comes next will get those contributions which could cost up to £35,000 a year.

It is time that Durham County Council reduced the number of Directors. If it is to select a Chief Exec from inside, there should not be a replacement position for the vacant Director position, but rather a reorganisation.

The council could operate quite comfortably without the Assistant Chief Exec position and one less director – many others do. The position of Director of Adult and Children’s Services has a budget and responsibility which is many many times that of other departments, so there is plenty of scope to make savings which could amount to £1m a year and help to protect other front-line services.

We have suggested this for many years and if it had been done already, millions of pounds would have been saved. Sadly our Labour-run council is ALWAYS behind the curve, and never a week goes by without it wasting money.

No answer to housing question at Cabinet – And no social housing either

Our Labour-run council is planning to build some private housing which it will then rent out. Great on the face of it. But it will not allow anyone on a low income to rent the properties. Rents will be as much as £200 a month over the local housing allowance rate.

I asked if after six years of my asking they would work with me to get some social housing built in our area. No answer was given to my question.

So we have a Labour run council happy to build luxury homes with taxpayers money and refusing to rent them out to anyone on housing benefit, whilst at the same time refusing to invest in social housing.

Meanwhile the Tories are putting social housing at risk through forcing the sale of homes without the money being made available to build new ones.

Begs the question “What’s the Difference between the Tories and Labour?

Forcing the sale of social housing without the money to reinvest is a madness – I expect that from the Tories. The Labour Party refusing to invest in social housing – that goes beyond madness, it is nothing short of disgraceful.

I will continue to push for social and affordable housing in our area on brownfield sites regardless of what our Tory-lite-Labour council does.

Milburngate Bridge closures

Below is the press release from the County Council about the closures planned for Milburngate Bridge. We did raise a variety of issues and suggestions with the Council about this asking that they do more to help reduce traffic in the City centre during the repair works and to look on this as a possible trial for longer term traffic reductions.

The council pretty much ignored us when we held a meeting with the Head of technical services a while ago. We asked for amongst other things:

Use of County Hall car park at weekends for free for visitors to the City.

Getting as many staff as possible to work from home at the Council and other large employers in the City.

Making the park and ride free for vehicles with multiple occupants.

Moving council meetings out of Durham City.

A huge number of other possible traffic reduction measures could have been looked at, but it was clear they didn’t want to listen to us.

Council press release:

People are advised of how they can help keep disruption to a minimum ahead of work starting on Milburngate Bridge in Durham.

The essential project, which will involve a major renovation of the bridge, gets underway on Sunday 12 July.

It will continue throughout the school summer holidays, when traffic using the route in peak hours usually falls by around 20 per cent, in order to minimise disruption as much as possible, although delays and congestion, particularly on other routes in and around the city, will be unavoidable.

Work will normally be carried out between 7am and 10pm, seven days a week, but working hours may be prolonged, if needed, to reduce the time it will take.

One lane will remain open at all times throughout the scheme and a footpath will also be provided.

The project will be delivered in three stages (see attached maps) – the first will see work carried out on the south lane and footpath, the second will be the north lane and footpath and the third will be the two centre lanes.

Start and end dates of each stage will be publicised as the scheme progresses.

The Claypath slip road will be closed throughout the works and the Walkergate slip road, which is off the south of the bridge on the same side as The Gates shopping centre, will be shut throughout the first stage of the project from Sunday 12 July until around 30 July. Diversions will be in place.

The footpath underneath the bridge between The Gates shopping centre and the Passport Office will be closed for part of the project – further updates will be provided closer to the time.

 

Access to Pimlico from Quarryheads Lane will be closed to all traffic for the duration of the works to prevent the road being used as a rat run. Local traffic will be able to access Pimlico via Grove Street and the parking bays will remain open.

It will also be necessary to close Milburngate Bridge completely for at least five nights, normally between 8pm and 6am – dates and alternative routes (see attached diversion map) will be publicised nearer the time but the first overnight closure will take place on 12 July.

The council is now advising motorists, public transport users and pedestrians of a number of steps they can take while the work is carried out.

John Reed, head of technical services, said: “We are doing our best to minimise disruption as much as we can by working from first thing in the morning to last thing at night as well as working overnight on some occasions.

“However, people need to be aware that there will unfortunately be delays in and around the city so we are urging everyone to help us keep this disruption to a minimum by only travelling if it is absolutely necessary.

“You can also consider alternative travel arrangements such as park and ride, avoiding peak times when travelling, thinking about changing working patterns, planning extra time for your journeys and planning any deliveries around peak times.

“We hugely appreciate the public’s understanding and cooperation in advance of this really important work.”

Cllr Brian Stephens, Cabinet member for neighbourhoods and local partnerships, added: “This work is essential and has to be done in order to secure the future of this vital route through the city for both those who live and work here and visitors.

“We completely understand that delays and disruption on the roads can be frustrating and we would like to thank motorists for their patience and encourage them to think about what steps they can take during the project.”

The bridge, which is nearly 50 years old and carries about 48,000 vehicles every day, is still safe but the work is now needed as it has been nearly 20 years since its last major renovation.

The work will involve new drainage, parapets, resurfacing, concrete repairs and a replacement waterproofing system.

Once the project has been completed the bridge is not expected to need any further major maintenance for around 15 to 20 years.

The scheme is expected to take around seven weeks to complete and cost up to £1m in total.

To keep up-to-date with the work, including live webcam streams, visit www.durham.gov.uk/milburngate and use #milburngate on the council’s Twitter and Facebook pages.

Ends

Call from council to be on your guard against rogue traders

Residents are being warned to be on their guard against rogue traders after a string of reports of doorstep crime.

Up to 10 incidents have been reported to our consumer protection team and police in the last few weeks.

Most have featured householders being offered bogus property improvement services, such as roofing and garden work – also known as fair weather crimes.

In some of the cases victims have reported that the rogue traders have driven them to the bank to withdraw cash.

Who is being targeted?

The incidents have taken place throughout the county and victims have been of all ages, including elderly and vulnerable people and women living alone.

Victims have reported handing over between £300 and £2,000 for the work, as well as jewellery. Nearly every case has resulted from cold-calling.

Cold calling

Rogue traders will typically call uninvited at people’s homes and offer goods and services on the doorstep.

More often than not, they exert extreme pressure on householders, charge inflated prices and display poor standards of workmanship.

The summer months often see a spike in these types of incidents as many people think about having work done around the house.

This is when rogue traders are at their busiest and, in many cases, they will target the elderly and vulnerable.

Look out for your neighbour

Trading standards officers from the consumer protection team are now calling on friends, relatives, neighbours and carers to look out for others in their community.

We are advising everyone to be on their guard against rogue traders and we would also ask residents to keep an eye out for any suspicious roofing or gardening work taking place at the homes of elderly or vulnerable family members and neighbours.

Rogue traders have a significant detrimental effect on the most vulnerable in our society and our officers will take robust action against anyone found to be taking advantage of people in this manner.

Our advice:

  • DON’T accept the services of uninvited, doorstep callers.
  • DO seek recommendations from friends and family.
  • DO try and use members of a trader’s scheme, for example Durham County Council’s Registered Trader Scheme.
  • DO call the police or trading standards if you suspect that rogue traders are operating in your community.

It’s time for Utilities to fix their damage permanently

It is increasingly annoying to see utility and other companies leaving our area looking a mess. They make huge profits, and as the example here on Dryburn Road shows, they are ruining grassed areas. The Council does’t seem to bother taking action until we intervene. Here, BT is parking regularly on the grass and has damaged it to such an extent that there is now standing water most of the time. I have asked our highways department to get them to fix this properly. If no other option is available they should create a hardstanding at this location so that when they access the broadband box they do not leave a mess. If you know of a similar location in Framwellgate Moor, Pity Me, Brasside or Newton Hall, please let us know.

WP_20150625_16_39_36_Pro

Community Speedwatch in Pity Me and Newton Hall

On Tuesday we carried out with volunteers and the police some community speedwatch sessions on Front Street in Pity Me and Canterbury Road in Newton Hall.

The results showed a very low level of speeding with only one vehicle at each location travelling at over 35 miles an hour (one at 35 and one at 37).

Out of 138 vehicles recorded in Pity Me, just seven were over 30 and most of those were at 31 or 32mph.

On Canterbury Road numbers were even lower.

I always take these figures with a pinch of salt because different times of day produce different results and also, with the best equipment and best will in the world drivers may spot the signs and start to slow down before you record the speeds, however the results are very encouraging.

The council rotates speed visors southbound on Front St and Canterbury Road, and I used local funding to provide a permanent visor between Pity Me and Framwellgate Moor which appears to continue to work well.

If there is a particular location where you want to get involved in doing a speed watch please get in touch with me.

Council planning system has disappeared today – Update

Update – it’ back up and running again.

http://publicaccess.durham.gov.uk/online-applications/search.do?action=simple&searchType=Application

Bizarrely the planning systems of every other council are working fine even though they use the same system, and  all other parts of the Durham County Council website are also working perfectly well.

Here’s what you get:

Page not found

The requested URL was not found on this server. If you had typed the URL, please check especially the following possibilities:

  • Perhaps the URL you typed contained lower case letters instead of upper case letters, or vice versa? URLs are case-sensitive, generally speaking.
  • A space somewhere? A URL must not contain a blank (space) character.
  • Check whether there are some extra characters at the end of the URL, or perhaps some missing characters.

So to get around this, if you wish to comment on an application you can email: dmcentraleast@durham.gov.uk or write to:

Planning Development (Central/East)
Room 4/86-102
County Hall
Durham
County Durham
DH1 5UL